Tallow & Pine
Tile

Tile Installation

Backsplashes, floors, showers, and surrounds — set level, spaced true, grouted and sealed clean.

Tile Installation after
Tile Installationdrag to reveal

For kitchens and baths ready for a real upgrade.

You might want this if…

  • Dated or cracked tile
  • A new backsplash or floor
  • A shower or tub surround
  • Waterproofing done right
  • Mixing tile with a repaint

What’s included

  • Substrate prep & waterproofing
  • Level, square layout
  • Wet-saw cuts & clean edges
  • Tile, stone, or porcelain set
  • Grout, seal & silicone joints
  • Protected, polished handover

Common questions

  • A lot — it’s where a finish is won or lost. Before any color goes on we move or cover furniture, mask floors and fixtures, fill and sand holes and cracks, caulk gaps, scrape loose material, wash surfaces, and spot-prime repairs and bare wood. On exteriors we power-wash and scrape first. The prep day is the day that makes the result last.

  • A single room is typically 1–2 days; a whole-home interior runs about a week. Cabinet refinishing is usually 3–4 days (doors are sprayed off-site). A single-story exterior is 3–6 days depending on prep and weather. Tile and drywall vary by scope — your written estimate includes a realistic schedule.

  • Yes. Every job carries a written 3-year workmanship warranty: if our work peels, cracks, or fails from our application, we come back and make it right. We also do a free touch-up visit within 60 days for any settling cracks.

Related services
Ready when you are

Let’s see what a real finish looks like.

Tell us what you’re transforming and we’ll send a free, itemized written estimate — usually within 48 hours. No pressure, no hard sell, just a clear scope and a fair price.